You are here: Home

Public documents

The Episode 3 project retains a system integration approach to assure a top down and coherent approach in the different work packages covering concept detailing, validation planning, performance assessments and results consolidation. These consolidated results and intermediate deliverables are published below.

documents by page

WP0 (Management)

Del. ID Document Title Availability Main Contributor
D0.2-02 First Year Periodic Activity Report (Publishable Executive Summary) Public EUROCONTROL
D0.2-02b Second Year Activity Report (Publishable Executive Summary) Public EUROCONTROL
D0.2-02c Second Period Activity Report (Publishable Executive Summary) Public EUROCONTROL
D0.2-02d Publishable Final Activity Report Coming Soon EUROCONTROL
D0.4-02 Documentation & Configuration Management Plan Public EUROCONTROL

WP2 (System Consistency including cells)

Del. ID Document Title Availability Main Contributor
D2.0-01 EP3 Consolidated Validation Strategy Public EUROCONTROL
D2.2-01c ATM Process Model Diagrams (SADT) Public EUROCONTROL
D2.2-040 SESAR DOD G - General Purpose Public EUROCONTROL
D2.2-041 SESAR DOD L - Long Term Network Planning Public EUROCONTROL
D2.2-042 SESAR DOD M1 - Collaborative Airport Planning Public EUROCONTROL
D2.2-043 SESAR DOD M2 - Medium/Short Term Network Planning Public EUROCONTROL
D2.2-044 SESAR DOD E1 - Runway Management Public EUROCONTROL
D2.2-045 SESAR DOD E2/3 - Apron & Taxiways Management Public EUROCONTROL
D2.2-046 SESAR DOD E4 - Network Management in the Execution Phase Public EUROCONTROL
D2.2-047 SESAR DOD E5 - Arrival & Departure - High & Medium/Low Density Operations Public EUROCONTROL
D2.2-048 SESAR DOD E6 - Conflict Management in En-Route - High & Medium/Low Density Operations Public EUROCONTROL
D2.2-049 SESAR DOD Lexicon - Glossary of Terms and Definitions Public EUROCONTROL
D2.2-050 Operational Scenarios - Annex to SESAR DOD G Public EUROCONTROL
D2.2-051 Use Cases - Annex to SESAR DOD G Public EUROCONTROL
D2.3-02 Validation requirements for Performance Framework Public EUROCONTROL
D2.3-06 Lessons Learnt for the application of E-OCVM to integrated Validation processes Public EUROCONTROL
D2.3-07 Lessons Learnt on Assumption Management Public ISDEFE
D2.4.1-01 Traffic Demand 2006 2020 X3 Public EUROCONTROL
D2.4.1-04 Performance Framework Public EUROCONTROL
D2.4.1-04a Influence Diagrams - Annex A to Performance Framework Public EUROCONTROL
D2.4.1-04b Catalogue of Performance Improvements (PI) and Traceability OI Step vs ECAC PIs - Annex B to Performance Framework Public EUROCONTROL
D2.4.1-04c User manual for the Influence model - Annex C to Performance Framework Public EUROCONTROL
D2.4.1-04d ECAC wide Performance model and input data repository (Zip folder: upload and change extension to .zip) Annex D Public EUROCONTROL
D2.4.3-01 White Paper on the SESAR Safety Target Public EUROCONTROL
D2.4.3-02 SESAR Top-Down Systemic Risk Assessment Public EUROCONTROL
D2.4.3-03 Note On Risk Model Validation Public EUROCONTROL
D2.4.3-04 Method for Systemic Risk Assessment for Units of Operation Public EUROCONTROL
D2.4.4-01 Environmental Assessment Validation Framework Public EUROCONTROL
D2.4.4-02 Environmental and Meteorological Screening and Scoping of the SESAR OIs Public EUROCONTROL
D2.4.4-03 Required enhancements of existing assessment noise models to validate SESAR Operational Improvements steps Public INECO
D2.4.4-04 Measures to reduce local aircraft emissions Public NLR
D2.4.4-05 Today operational task analysis - Human Factor Assessment Public EUROCONTROL
D2.5-01 Episode 3 Final Report and Recommendations Public EUROCONTROL
D2.5-02 Dissemination Package (Zip folder: upload and change extension to .zip) Public EUROCONTROL

WP3 (Collaborative Planning Process)

Del. ID Document Title Availability Main Contributor
D3.2.1-01 Collaborative Planning Process WP3 Validation Strategy Public AENA
D3.3.1-01 Medium & Short Term Network Planning and Collaborative Airport Planning - Expert Group Experimental Plan Public AENA
D3.3.1-02 Collaborative Network Planning Expert Group Report Public AENA
D3.3.1-03 Analysis of the SESAR Collaborative Planning Information: Demand and Capacity Public INECO
D3.3.1-04 Airline/Airport Data Exchange Public EUROCONTROL
D3.3.1-05 Collaborative Airport Planning Expert Group Report Public EUROCONTROL
D3.3.2-01 Experimental Plan for Business Trajectory Management and Dynamic DCB Public EUROCONTROL
D3.3.2-02 Simulation Report on Business Trajectory Management and Dynamic DCB Public EUROCONTROL
D3.3.2-02a Gaming Experiment - Annex A to Simulation Report on Business Trajectory Management and Dynamic DCB Public Eurocontrol
D3.3.2-02b Process Simulation - Annex B to Simulation Report on Business trajectory Management and Dynamic DCB Public EUROCONTROL
D3.3.3-01 Experimental Plan on Airspace Organization and Management Public AENA
D3.3.3-02 Simulation Report on Airspace Organization and Management Public AENA
D3.3.4-01 Experimental Plan on Collaborative Airport Planning Public EUROCONTROL
D3.3.4-02 Simulation Report on Collaborative Airport Planning Public DLR
D3.3.5-01 Experimental Plan on Global Performances at Network-Wide Level Public Isdefe
D3.3.5-02 Report on Macro modelling on Global Performances at Network-Wide Level Public Isdefe
D3.4-01 Collaborative Planning Results and Consolidation Public AENA

WP4 (En Route and Traffic Management)

Del. ID Document Title Availability Main Contributor
D4.2.1-01 En-route and Traffic Management WP4 Validation Strategy Public NATS
D4.3.1-01 En route Expert Group Plan Public Isdefe
D4.3.1-02 En-Route Expert Group Report Public Isdefe
D4.3.1-02a Questionnaires - Annex to En-Route Expert Group Report Public Isdefe
D4.3.1.1.1-01 En Route Complexity Management Expert Group Plan Public Isdefe
D4.3.1.1.1-02 En Route Complexity Management Expert Group Report Public Isdefe
D4.3.2-01 FTS on 4D trajectory management and complexity reduction - Experimental Plan Public DSNA
D4.3.2-02 Simulation Report on 4D Trajectory Management and Complexity Reduction Public DSNA
D4.3.3-01 Gaming Plan on Queue, Trajectory and Separation Management Public Isdefe
D4.3.3-02 Gaming Report on Queue, Trajectory and Separation Management Public Isdefe
D4.3.4-01 Prototyping Experimental Plan on Queue, Trajectory, and Separation Management Public EUROCONTROL
D4.3.4-02 Prototyping Report on Queue, Trajectory and Separation Management Public EUROCONTROL
D4.4-01 En-Route Consolidated Assessment Report Public DFS

WP5 (Airport and TMA)

Del. ID Document Title Availability Main Contributor
D5.2.1-01 Airport and TMA WP5 Validation Strategy Public DFS
D5.3.1-01 TMA Expert Group Plan Public LFV
D5.3.1-02 TMA Expert Group Report Public LFV
D5.3.2-01 Airport Expert Group Plan Public NATS
D5.3.2-02 Airport Expert Group Report Public NATS
D5.3.3-01 Runway Operations Fast Time Simulation Plan Public EUROCONTROL
D5.3.3-02 Runway Operations Fast Time Simulation Report Public EUROCONTROL
D5.3.4-01 Fast Time Simulation Plan on Multi-Airport TMA Operations in the core area of Europe Public NLR
D5.3.4-02 Fast Time Simulation Report on Multi-Airport TMA Operations in the core area of Europe Public NLR
D5.3.5-01 Simulation Plan on Separation Management in the TMA Public AENA
D5.3.5-02 Simulation Report on Separation Management in the TMA Public AENA
D5.3.6-01 Exercise Plan - Prototyping of a Dense TMA Public EUROCONTROL
D5.3.6-02 Report on the Prototyping of a dense TMA Public EUROCONTROL
D5.4-01 TMA and Airports Consolidated Assessment Report Public NATS

WP6 (Technological enablers)

Del. ID Document Title Availability Main Contributor
D6.2-01 Overall Description of the WP6 platform and its capabilities Public AIRBUS
D6.3-01 Requirements for Technical Validation Public EUROCONTROL
D6.3-02 Report on the Benefits of Using Airborne Data in Controller Tools Public NATS
D6.4-01 Technical Validation Scenarios Public AIRBUS
D6.5-01 Technological Enablers Validation Report Public AIRBUS, THALES
D6.5-01a 4D Airborne Navigation Capability for CTA/RNP - Annex A to Technological Enablers Validation Report Public AIRBUS, THALES Avionics
D6.5-01b Air-Ground Initial 4D Mgt - Annex B to Technological Enablers Validation Report Public AIRBUS, THALES
D6.5-01c ASAS Spacing - Annex C to Technological Enablers Validation Report Public AIRBUS, THALES
D6.5-01d Transition 4D - ASAS - Annex D to Technological Enablers Validation Report Public AIRBUS
D6.5-01e Platform - Annex E to Technological Enablers Validation Report Public AIRBUS, THALES Avionics
Document Actions